Hono
- Engineering · Part 13
The 1am switchover: every test passed, but Claude couldn't connect
The rewrite took nine days. The switchover took about 10 minutes. Then the one bug showed up on a runtime our tests never ran on.
- Engineering · Part 6
153 lines became 94: what Hono took out of every feature
I liked AdonisJS but feared being locked into its way of doing everything. For Flair v2 I moved to Hono inside TanStack Start, on Bun. Saving a customer went from 153 lines of server code to 94, and memory fell by a third.

